Vanity update

Spring break is over, but not my renovation project. Parts of it are done, though. The new vanity is in. The new faucet is in. The shut-off valves are replaced (they are compression valves-- I am not brave enough to solder copper). The sink has a drain-- I replaced the trap and ran it into the drain. The trap is pvc, but the pipe in the wall is ABS. This required a connector and a glue that the man at the hardware store sent home with my husband. I've talked before here about men not believing that I know anything about plumbing, so I sent the pieces with my husband and told him what I needed (because he really does not know anything about plumbing).

The bright side is that once I finish the painting and the edging on the floor, it is pretty much done.I have not started with the floor by the toilet, yet. The joy of peel and stick tiles is that I can do part of the project, and then stop. ;) The toilet needs replacing, but I am kind of afraid to tackle that without my dad around for moral support at the least.

0 comments:


 

Blogger Template Sponsored by Top 10 Best Business Web Hosting Reviews